Watershed Protection and Slope Stability at Dunnsville Road
Guilderland
Summary
Residents and town officials are closely watching a home addition request near a critical drinking water reservoir and steep slope. The board wants solid engineering data to make sure construction won't cause erosion or water contamination.
At a glance
- Total mentions
- 1
- Last 30 days
- 0
Last discussed Jun 3, 2026.
Impact analysis
The applicant faces additional engineering and testing expenses to fulfill soil boring requirements.
The broader community benefits from rigorous protection of the Watervliet Reservoir drinking water supply.
The property owner experiences project delays and increased administrative and testing costs.